The digger man came today and dug a 6' hole for the
balmoral septic tank
We got it into position, and levelled.
I also got the generator installed today, I had built a dry walled house for it, to keep it dry and also to try and keep the noise away from the caravan.
I got it in and wired in, that should supply the caravan with plenty of power. The only remaining work is to install the remote start/stop for it - but not today.
The other task was to install the piping between the caravan and the septhic tank. This was a slow procedure - we had about 80 yards of pipe to install. But we got there in the end.