Diary - 11 Aug 2003 - Progress on site...

<<< Wed 06 Aug - Generator Bought Aug 2003 Tue 12 Aug - Moved in >>>
Mon 11 Aug - Progress on site...

The digger man came today and dug a 6' hole for the balmoral septic tank balmoral bcap6 septic tank - click for larger image We got it into position, and levelled.

I also got the generator installed today, I had built a dry walled house for it, to keep it dry and also to try and keep the noise away from the caravan.

I got it in and wired in, that should supply the caravan with plenty of power. The only remaining work is to install the remote start/stop for it - but not today.

The other task was to install the piping between the caravan and the septhic tank. This was a slow procedure - we had about 80 yards of pipe to install. But we got there in the end.

Pre-Site work - 11 Aug 2003

© Copyright 2004-2007 - Simon McCaughey -