Diary - 13 Mar 2004 - Stud walls up

<<< Thu 11 Mar - Fireplace brickwork complete Mar 2004 Mon 15 Mar - Ready for floor >>>
Sat 13 Mar - Stud walls up

Dad got material for the stud walls today, and I gave him a hand. We got the two stud walls up, and plasterboarded the gable end wall, ready for dry-lining. One side of each stud wall has been left off to allow the electrician to put in the lightswitches. [more]

Posted Mon Mar 15 08:04:33 2004
Inside - 13 Mar 2004

© Copyright 2004-2007 - Simon McCaughey -