| <<< Mon 19 Apr - Most doors on | Apr 2004 | Wed 21 Apr - Arcitrave on >>> |
The site was very busy today again, joiners continued to hang doors, and have now got a lot of the door handles on. The skirting board and arcitrave all arrived today too.
The suite we ordered from Reids came today, but unfortunately there was some sort of mix up with the single-seater, and it hasn't been delivered.
All the sanitaryware arrived today too, and is all piled in the living room. Hopefully it won't be too long before the plumber has it all fitted. He got the main shower, and the bath in this afternoon. The cisterns for the two ensuites are not the correct ones, as we didn't want the top flushing ones, so that will have to be sorted tomorrow.
There is also a small problem in the bathroom, the wall was left un-skimmed for tiling, but unfortunately the shape of the shower is not as big as we had thought, and there is a small portion at the sides of the showers which would need skimmed. Posted Tue Apr 20 20:44:33 BST 2004