| Home | Site Map | Views | Contact |
| <<< Fri 19 Mar - Floors completed | Mar 2004 | Mon 22 Mar - Drains opened >>> |
With the digger back on site the temporary dry block house I built for the generator had to be removed, so that the earth could be levelled. This was a mucky procedure, as the ground is very wet, but the tractor got in and out without too much trouble.
Posted Mon Mar 22 07:57:38 2004© Copyright 2004-2007 - Simon McCaughey -