Diary - 23 Mar 2004 - Drains filled in

<<< Mon 22 Mar - Drains opened Mar 2004 Wed 24 Mar - Topsoil tidyup >>>
Tue 23 Mar - Drains filled in

All the drains have now been covered. The gas installer was back to join the gas pipe at the wall, it now goes into the garage. Ducts have been left for the heating pipes for the plumber to use when he comes back. [more]

Posted Thu Mar 25 08:15:32 2004
Outside - 23 Mar 2004

Driveway - 23 Mar 2004

View - Side - 23 Mar 2004

View - Road - 23 Mar 2004

View - Back - 23 Mar 2004

© Copyright 2004-2007 - Simon McCaughey -