After a week of almost no activity the digger is back on site and filling up the inside and outside of the house. The filling is then covered in a layer of stones, and pounded down. The steel mesh is then laid out on 3" bricks, ready for the concrete to be poured on top. The concrete is supposed to arrive 8:30 am tomorrow, and the slab should be finished by tomorrow evening. The brickies are due back on Monday to start the main brickwork of the house. [more].