The Exterior

Wed 28 Apr - Gas installed

Mon 26 Apr - Step sides plastered






A couple of views from the top of the field tonight

Mon 19 Apr - Doorsteps built

Fri 16 Apr - Cleaning starts

Wed 14 Apr - Halogen light fitted

Wed 07 Apr - Boiler house roofed

Tue 06 Apr - Boiler house plastered

Mon 05 Apr - Boiler house plastered

Fri 26 Mar - Groundworks complete

Wed 24 Mar - Topsoil tidyup

Tue 23 Mar - Drains filled in

Mon 22 Mar - Drains opened

Always trouble moving phone cables, the single core copper strands are too brittle. The last time the cable was moved it gave trouble too, these things always take longer than expected.

Thu 11 Mar - Temporary boiler house

Mon 08 Mar - External door lights

The lights have been installed outside the front and back door.

Thu 04 Mar - Plasterwork complete

Fri 27 Feb - Snow pictures

Thu 26 Feb - Snow!

We have had a couple of inches of snow today!

Wed 18 Feb - Plaster work at front

Fri 13 Feb - Plaster bands at back

Wed 11 Feb - Dry Weather

Sat 07 Feb - More filling

The house demolished in Articlave was brought here today. This should clean the place up a bit!

Thu 29 Jan - Plaster

The plasterers have started work on the outside of the house, with a first coating on the family room, and the back wall.